TEST

Issue Description:
testing
Issue Resolution:
test


PMO Info

Issue Probability:   3
Issue Criticality:   3
Risk Score: 9



Risk Stats

Open Date: 3-2-2025
Closed Date: --
Issue Open Days: 3



Status

Status: Open
Issue Owner: TEST
Project ID: PMO-2024-034-009

Risk Notes
4/3/2024 Chris Freeman 04/03/24: Spoke to Tony P. of GITR, stated that lead time is only 4 weeks, then 7 day scan, 5 day review. This means Tomas Verde must present by mid-April for IT for Go/NoGo to make a 6/1 data extract.
2/5/2024 Chris Freeman Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Xonsectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Rempora incidunt ut labore et dolore magnam aliquam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Xonsectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
1/9/2024 Chris Freeman Reached out to Joseph today and now informed that Alan is no longer with the company and unclear as to who can resolve the issue
1/1/2024 Chris Freeman Quasi ratione sint. Sit quaerat ipsum dolorem. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Xonsectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Odio et unde deleniti